Back to Módulo Location
Wall 2 - Gabion Fill Wall
Updated May 09, 2016
This article applies to:
- RoadEng Civil
- RoadEng Forestry
Gabion Fill Wall
Gabion wall for fill situations.
Typical Cross Section

Parameters
| bSGSuper | Set to one if the sub-grade has crown or superelevation. | |
| SG_VOffset | Wall vertical offset from profile attachment point. | |
| WallOffsetX | Horizontal offset from centerline. | |
| BlockWidth | Width of a block (as seen in the cross section). | |
| BlockHeight | Height of a block. | |
| BlockOffset | Horizontal offset from inside of block to inside of block above. This value should be less than BlockWidth. | |
| WallRowFactor | Percent of the bottom face of the bottom block which can be above ground. | |
| WallBaseOffset | Horizontal offset at the bottom of the wall. | |
| WallBaseSlope | Wall base offsett slope | |
| WallOffsetSlope | offset slope |